Nestle Bulgaria AD, Sofia

 

DESCRIPTION

Energy saving heat exchanger units with total air flow 7 495 m³/h;
Galvanized steel air ducts;
Circulation pumps Wilo;
Reconstruction of the energy scheme of the “Social Building” – a cascade of 4 pcs.;
Boilers Viessmann with capacity of 4×105 kW, providing gas supply, construction of GRT to reduce the need;
Design and construction of a 6 bar steam pipeline to supply a production line;
Reconstruction of a boiler room – delivery of a 500 l stainless steel boiler with a heat exchanger for steam, a pump and a control panel for the system.

 

WORK

Design, delivery and installation of ventilation and heating equipment, including construction and installation work, commissioning, service and maintenance.